plastering #2
Plastering second phase completed.
This month saw the second phase of the plastering completed.
First the double height walls were tackled by John and his team... Moving round to the dining space and tying up with the kitchen… Looking up towards the master bedroom... Back to the double height above the corner window.
Some views to the sitting space from the office mezzanine.
The office being completed at the same time...
Then the double height ceiling was done...